I build the production planning and analysis layer that small manufacturers need and can't buy — finite schedulers, material shortage analysis, capacity and delivery dashboards — on top of the MRP data you already have. No ERP replacement. No subscription. You own the result outright.
Five kinds of tool, all of them reading the data your plant already produces.
I could quote you a scheduler today, but it would be a guess, and a fixed-price guess is bad for both of us. So the first engagement is two weeks and it ends with a written answer rather than a system.
Builds run $4,500 to $35,000, quoted as a fixed price after the assessment, based on what the roadmap actually says.
outsourced jobs were quietly running late under a scheduling rule that reported zero late. The rule ignored the real turnaround on work that leaves the plant and comes back.
moved from “material short” to “can run” once approved substitute materials were pooled into the availability check. The inventory was already on site.
Findings from tools now running daily inside a DFW compounding plant. Details anonymized.
These conventions exist because each one was learned the hard way. Together they're the answer to what happens to your tool after I'm no longer involved.
Capacity is limited to two engagements at a time. Availability quoted at first contact.
No cost, no obligation, no presentation. I walk your floor, sit with whoever sequences production and whoever buys material, and tell you honestly whether there's anything here worth doing.